Tender No N.I.T. No Short Description N.I.T. Date Tender Status
295 upgradationofallworksinIDC Upgradation of P.H. works and other works in IDC Karnal 14/08/2014 Locked
282 HSIIDC/IMT/BAWAL/14/06 Construction of Approach Road No. 7 over Culvert in Ph-II, Bawal 10/07/2014 Locked
281 HSIIDC/IMT/BAWAL/14/05 Housekeeping & Gardening Services of Office Building & Complex at IMT, Bawal 10/07/2014 Locked
280 HSIIDC/IMT/BAWAL/14/04 Maintenance of 2450 Plants & Lawan Area in Ph-II at IMT, Bawal 10/07/2014 Locked
279 HSIIDC/IMT/BAWAL/14/03 Maintenance of Horticulture Works at IMT, Bawal 10/07/2014 Locked
277 Rohtak/Hort/Ph-II Providing & Mant. of horticulture work in Ph-II, IMT Rohtak 30/04/2014 Locked
272 HSIIDC/IA/UV/05 Providing and Laying of storm water drainage system in Sector 34 & 35(between 24/06/2014 Locked
270 hsiidc/karnal/AllworksIDC,Karnal. Up gradation of Water Supply,storm water & const. of dustbin at IDC,Karnal. 09/06/2014 Locked
269 hsiidc/karnal/Boundarywall Construction of boundary wall of g.belt in Sec-3 & 3A,at Karnal. 06/06/2014 Locked
257 HSIIDC/IMT/BAWAL/14/02 Construction of Approach Road for connectivity of Road No. 7, Ph-II, IMT, Bawal 26/05/2014 Locked
239 HSIIDC/Karnal/IDC/Up-gradationworks Upgradation of water supply, storm water and dustbins in IDC at I.E.,Karnal. 26/02/2014 Locked
238 1/HSIIDC/Rai Providing of Infrastructure facilities in pockets earmarked for allotment under 22/02/2014 Locked
235 235 O&M of CETP of 0.5 MLD capacity on turnkey basis 20/02/2014 Live
233 HSIIDC/SE(E)/2014/03 Electrification and street lighting works for R&R Area at IE Bahadurgarh 18/02/2014 Locked
230 HSIIDC/Karnal/Sec-3&3A/BoundaryWall Upgradation & const. of boundary wall 12/02/2014 Locked
229 HSIIDC/SE(E)/2014/02 66/11KV substation with SAS at Sector-34&35, Gurgaon on turnkey basis 11/02/2014 Locked
223 HSIIDC/SE(E)/2014/01 Shifting of 11KV Kasola rural feeder from Phase-II & IV, IMT Bawal 30/01/2014 Live